Jaywant Sugars Limited

Environment Management Plan

Environment Management Plan is required for ensuring sustainable development. JSL has established proper Environment Management Plan for Environment Aspects and proposed with proposed action plan.

Working of Environment Management Plan:

  • Environmental Policy
  • Planning
    • Environmental Aspects
    • Objectives & Targets
    • Environment Management
  • Implementation
    • Implementation of EMP in all Divisions Sugar, Co-gen and Distillery.
    • Document Control
    • Operational Control
    • Emergency Preparedness & Response.
  • Checking/Corrective Aspect
    • Monitoring Measurement
    • Non-Conformance & Corrective Action
    • Record
    • EMS Audits
  • Management Review
    • Management Review

 

JSL has adopted most advanced treatment units for Pollution Control.

Effluent Generation Sugar Unit
JSL has 400 CMD capacity ETP plant with primary, secondary and tertiary units.
Distillery Division (Proposed)
Raw spentwash will be primarily evaporated in Integrated Evaporation System followed by standalone Evaporation. Further it will be incinerated in advanced pollution control equipment i.e. 21 TPH incineration Boiler to achieve Zero Liquid Discharge.
Air Pollution Control Cogeneration
Existing Air Pollution equipment wet scrubber.
Incineration
Advanced Air Pollution control equipment Electrostatic Precipitator (ESP) will be installed for proposed incineration Boiler of Distillery with stack height of 69 Meters.
Solid Waste Management Solid waste generated in form of Boiler ash generated from Baggass burning in Boiler is stored in Ash Pit and used as fertilizer by farmers.
Jaywant Sugars Limited © All Rights Reserved 2022.